Case Study: CyrusOne strengthens data center infrastructure with Facility Solutions Group

A Facility Solutions Group Case Study

Preview of the CyrusOne Case Study

FSG Provides Professional Installation of Emergency Power Generators for Dallas-Area Data Center Expansion Project

cyrusOne required a mission-critical technology infrastructure upgrade for its data centers in Lewisville and Carrollton, Texas. They engaged vendor Facility Solutions Group to provide a reliable solution for installing new cable, fiber, and panels to ensure safe and reliable data storage for their clients.

Facility Solutions Group designed and implemented a complete VisiPatch-certified Systimax system. The extensive solution included over 13,400 Cat6a cables, more than 12,300 strands of fiber, and the installation of 120 server cabinets with specialized overhead trays and wall fields. This upgrade successfully provided the robust and reliable system foundation that cyrusOne's customers depend on.