The customer, CyrusOne, faced the critical challenge of ensuring continuous backup power for an expansion of their data center in Carrollton, Texas. For this high-priority project, they enlisted the electrical contractor FSG Dallas to professionally install two 2250 kW emergency generator sets to protect their infrastructure from outages.
FSG supervised the preparation of the generator pad sites and expertly installed the new gensets, along with all necessary connections to the parallel switchgear and load banks. The result was a flawless execution of the $2.6 million electrical scope, with FSG delivering a fully installed, tested, and commissioned emergency power system that was successfully handed off to the customer.