Case Study: Corpus Christi ISD opens Los Encinos Elementary School on time with Facility Solutions Group electrical construction

A Facility Solutions Group Case Study

Preview of the Corpus Christi ISD Case Study

FSG provided turnkey electrical construction services from design to punch list

Corpus Christi ISD faced the challenge of constructing Los Encinos Elementary, a taxpayer-funded project demanding extreme fiscal responsibility and ethical practices from every contractor. They needed a partner to provide efficient and effective turnkey electrical construction services and chose Facility Solutions Group (FSG) for the task based on their strong reputation.

FSG delivered complete electrical construction services from design through installation and final punch list. Their solution enabled the general contractor to deliver the project on time despite a delay from Hurricane Harvey, resulting in the successful and expected opening of the new elementary school for the community.