FSG provided full service electrical construction for the Courtyard by Marriott on the San Antonio Riverwalk

The Marriott hotel chain faced a complex electrical construction challenge for its new Courtyard Riverwalk location in San Antonio. The major difficulty was the downtown site's limited access and lack of space, as the multi-story hotel was being constructed between two existing high-rise buildings. Facility Solutions Group (FSG) was hired to provide turnkey electrical construction services to meet this demand.

To solve the spatial constraints, Facility Solutions Group implemented a strategy of Just-In-Time (JIT) deliveries and utilized an off-site lay-down yard for material handling. This approach required and achieved close cooperation with all project trades. As a result, FSG ensured the project operated smoothly, was completed successfully, and finished on time.


Open case study document...

Facility Solutions Group

338 Case Studies