Case Study: Cypress-Fairbanks Independent School District builds Bridgeland High School with Facility Solutions Group

A Facility Solutions Group Case Study

Preview of the Cypress-Fairbanks Independent School District Case Study

FSG provided complete electrical construction services for this very large high school project in the Houston area

The Cypress-Fairbanks Independent School District (CFISD), the third-largest school district in Texas, required a partner for the electrical and systems work on a major new high school. They partnered with Facility Solutions Group (FSG) to leverage the vendor's expertise in design and construction best practices to ensure the project was completed with a focus on safety, efficiency, and professionalism from the outset.

Facility Solutions Group provided comprehensive electrical services for the 570,000-square-foot Bridgeland High School, a state-of-the-art facility featuring academic wings, fine arts spaces, and extensive athletic amenities. FSG's solution included the main building's systems and sports lighting for multiple outdoor fields, successfully delivering a key part of the district's 120-acre educational village and reinforcing their capability to handle large-scale, complex projects.


Open case study document...

Facility Solutions Group

338 Case Studies