Case Study: Hines achieves a timely downtown Houston high-rise delivery with Facility Solutions Group electrical construction

A Facility Solutions Group Case Study

Preview of the Hines Case Study

FSG provided complete electrical construction services for this stunning 48 story high rise in downtown Houston

The owner, Hines, required sophisticated electrical construction services for a new 48-story high-rise in Houston, a complex project demanding exceptional quality and precision. Facility Solutions Group (FSG) was selected by the general contractor, Harvey Builders, to provide the expert electrical construction needed to bring the architecturally unique building to life.

Facility Solutions Group developed a highly detailed engineering and project management plan, utilizing just-in-time procurement and balanced labor curves to maintain the schedule and budget. As a result, FSG successfully delivered all contracted electrical services, enabling the general contractor to complete the building on time for the first tenants to move in as planned.


Open case study document...

Facility Solutions Group

338 Case Studies