Case Study: Link Logistics achieves energy savings and brighter exterior lighting with Facility Solutions Group

A Facility Solutions Group Case Study

Preview of the Link Logistics Case Study

FSG Delivers Top Quality Lighting and Energy Savings in Las Vegas

Link Logistics, a manager of over 3,500 commercial facilities, faced a challenge with the aging and inefficient exterior lighting at two of its buildings in Las Vegas. Seeking significant energy savings and improved illumination, the company enlisted Facility Solutions Group (FSG) to perform a lighting retrofit.

FSG's solution was to replace 47 outdated metal halide fixtures with modern, efficient LED lighting. The project was completed successfully, providing the client with bright, professional nighttime lighting. The retrofit delivered substantial measurable impact, reducing energy use by 73,500 kWh and generating $7,717.53 in annual cost savings for Link Logistics.