Collin College, in partnership with general contractor Skanska, faced the challenge of completing the electrical construction for a new 339,000 square-foot campus on an extremely tight 18-month timeline. They needed a capable electrical partner to manage this large-scale project with minimal margin for error, leading them to select Facility Solutions Group (FSG) for the work.
FSG provided full-scale electrical construction, including installing power systems, wiring, and lighting. They managed material logistics during the pandemic and assisted with design changes to keep the project on schedule. The result was the successful on-time completion of the project for Collin College, executed by a team of 110 electricians. FSG also extended its service beyond the original scope by expertly installing a large art piece in the student center, delivering a complete and successful outcome for the customer.