The Cypress-Fairbanks Independent School District required a reliable emergency power system for its new Bridgeland High School to ensure critical systems remained online during power outages. Facility Solutions Group (FSG) was brought on to install a comprehensive 750 kW backup generator solution for this high-priority project.
FSG managed the entire installation process, from supervising the preparation of the generator pad to placing the genset and making all critical connections to the switchgear. The vendor executed the $550,000 project flawlessly, delivering a fully tested and commissioned emergency power system that was successfully handed off to the customer.