Case Study: First Baptist Belton improves HVAC control and lowers costs with Facility Solutions Group

A Facility Solutions Group Case Study

Preview of the First Baptist Belton Case Study

FSG brought a complete energy management solution to a local congregation to help enrich the comfort and safety of the facility while lowering operational spending

The customer, First Baptist Belton, faced a challenge in managing its facility's disparate mechanical systems. Nathan Parr, the Operations Manager, needed to integrate existing chiller controls with new thermostats across the campus and monitor everything from a single, centralized dashboard. To address this, the church partnered with Facility Solutions Group for an energy controls solution.

Facility Solutions Group implemented a master integration solution, connecting the existing worship center chiller controls with newly installed wireless thermostats. All data was centralized into one dashboard, providing complete HVAC management. This integration with the existing equipment drastically reduced installation costs, saving the need for expensive new chiller controls, and allowed for more efficient operational spending.


Open case study document...

Facility Solutions Group

338 Case Studies