Facility Solutions Group
338 Case Studies
A Facility Solutions Group Case Study
Dillard's, a major department store retailer, faced a challenge with the outdated metal halide lighting in its distribution center. The fixtures were energy-intensive and required constant maintenance, which was increasing operational costs. Dillard's needed a more efficient lighting solution from Facility Solutions Group that would not compromise on the light quality essential for its accurate product picking and shipping operations.
Facility Solutions Group addressed this by testing and installing new high bay LED fixtures. The vendor successfully completed the retrofit in a short timeframe, achieving the desired results. The project resulted in significantly lower energy consumption and provided higher, more consistent light levels on the working floor, which left the customer highly satisfied.
Jeff Bowen
Director of Technical Operations