Facility Solutions Group
338 Case Studies
A Facility Solutions Group Case Study
The Town of Dover sought to upgrade its downtown lighting with historically-styled, energy-efficient LED fixtures and poles, but faced a tight timeline between budget approval and the holiday season. They engaged Facility Solutions Group to supply and install the custom-made decorative streetlights before the Christmas decoration deadline.
Facility Solutions Group utilized a cooperative purchasing solution to streamline the process, supplying and installing 53 decorative poles and 100 LED fixtures. This approach saved the town time and money, and the project was completed on schedule. The town's engineer stated that Facility Solutions Group's performance exceeded expectations, ensuring the new lighting was ready for the holiday decorations.