Facilio
16 Case Studies
A Facilio Case Study
Dubai World Trade Center, a 1.7 million sq. ft. premium business center in Dubai, faced penalties from chilled water temperatures, high energy consumption, lack of real-time visibility and control, and rising customer escalations while trying to meet sustainability goals. To address these challenges it partnered with Facilio, deploying the Facilio Connected Buildings platform with Delta T monitoring and its Fault Detection & Diagnostics (FDD) capabilities.
Facilio implemented granular energy visibility, trend analysis, asset run‑hour tracking, condition‑based monitoring and automated workflows to eliminate chiller non‑compliance, flag energy spikes and speed fault remediation. As a result, Facilio helped DWTC cut energy waste by 8% within three weeks, identified up to 15% further savings potential, eliminated unwarranted penalties, reduced customer escalations, and delivered a six‑month payback while improving equipment performance and tenant satisfaction.