Case Study: ORYX GTL achieves simplified multi-site network management, increased availability and IIoT enablement with Extreme Networks' Fabric

A Extreme Networks Case Study

Preview of the Oryx GTL Case Study

Oryx GTL - Customer Case Study

ORYX GTL, a Qatar-based downstream oil and gas company that converts natural gas into liquid hydrocarbons, needed to modernize its network for the Industry 4.0 era to ensure plant stability, mitigate hazards, and support high-tech infrastructure. To simplify operations across multiple locations and enable Industrial IoT, ORYX GTL engaged Extreme Networks and its Extreme Fabric solution.

Extreme Networks deployed a new network infrastructure powered by Extreme Fabric, simplifying network management across four sites, increasing network availability, and enabling the rollout of new Industrial IoT devices. The Extreme Networks implementation delivered improved reliability and operational efficiency, helping ORYX GTL support advanced automation and safety initiatives across the plant.


Open case study document...

Oryx GTL

Ehad Abdel Rahman

Head of ICT Operations


Extreme Networks

385 Case Studies