Case Study: FMH Conveyors achieves 75% faster quote production and improved accuracy with Experlogix CPQ for Dynamics GP

A Experlogix Case Study

Preview of the FMH Conveyors Case Study

Manufacturer Configures Custom Conveyors for Top Retailers & Distribution Centers

FMH Conveyors, a manufacturer of configurable gravity and powered conveyors for distribution centers and retail loading/unloading, struggled to produce accurate, timely quotes for thousands of possible configurations. Complex quotes required more than five spreadsheets and took at least half a day to calculate, leading to frequent engineering and data-entry errors and a need for seamless integration with their Microsoft Dynamics GP Manufacturing ERP.

FMH selected Experlogix CPQ for Dynamics GP Manufacturing for its tight integration and robust rules engine. The configurator created a single source of sales and engineering data, automated quote-to-order and production document generation (including BOMs and routings), cut proposal production time by 75%, reduced engineering change requests, and made the quoting process faster, more accurate and easier to refine as the company’s needs evolve.


Open case study document...

FMH Conveyors

Don Kennedy

Configuration Engineer


Experlogix

99 Case Studies