Case Study: Cleveland Electric boosts prefab productivity with EVOLVE

A EVOLVE Case Study

Preview of the Cleveland Electric Case Study

How EVOLVE helped Cleveland Electric get further ahead by making their process faster and easier

Cleveland Electric, a leading Atlanta-based electrical and mechanical contractor, faced a challenge in capitalizing on the expected efficiencies of its in-house prefabrication shop. The company was bogged down by manual drawing processes in its BIM department, which prevented it from reducing costly field work and improving overall project workflow. Seeking to get ahead, Cleveland Electric partnered with vendor EVOLVE for a software solution.

EVOLVE implemented its software to streamline Cleveland Electric's design and fabrication process. The solution automated manual drawings, providing the prefab shop with precise models and spool sheets from which to build assemblies, drastically increasing accuracy and volume. This resulted in a significant boost in shop productivity, a smoother workflow for last-minute tasks, and overwhelmingly positive feedback from employees, with the prefab group reporting it was "the best thing ever."


Open case study document...

Cleveland Electric

Mike Jensen

Director of Virtual Construction


EVOLVE

14 Case Studies