Mark III Construction, a prominent MEP subcontractor, faced significant challenges using Autodesk Revit for their design and fabrication processes. Their VDC team found Revit Families (RFAs) to be overly flexible and time-consuming, causing inaccurate take-offs and inflating models. Detailers wasted an estimated 25% of their time waiting for views to load, and spooling was a complex, multi-day operation that hindered their workflow.
By implementing the EVOLVE Revit add-in, Mark III streamlined its operations, replacing three separate add-ins with a single, simplified platform. EVOLVE provided superior tools for manipulating parts and extracting fabrication data, which reduced modeling time by 50%. The solution minimized revisions, accelerated project startup through templatization, and empowered the team to react more quickly to changes, resulting in greater speed and efficiency.