Case Study: Critchfield Mechanical boosts Revit workflow efficiency with EVOLVE

A EVOLVE Case Study

Preview of the Critchfield Mechanical Case Study

EVOLVE provided the ability to expand Revit's capabilities and automation tools they desperately needed

Critchfield Mechanical, a mechanical, electrical, and plumbing (MEP) contractor, was facing significant workflow inefficiencies during its transition to Revit. Their challenges included time-consuming manual processes for reporting and design, coordination gaps between teams, and difficulty tracking change orders. This automation bottleneck hampered productivity and threatened project timelines, leading them to seek a comprehensive solution from vendor EVOLVE.

By implementing the EVOLVE suite of tools, Critchfield Mechanical automated key tasks like annotation, reporting, and hanger design. The integration with their existing Stratus system streamlined data flow and coordination. EVOLVE delivered transformative results, including a drastic reduction in manual effort; fabrication preparation time on one project dropped from 40 hours to just 8. The solution led to significant time savings, improved accuracy, and enhanced overall efficiency for the contractor.


Open case study document...

EVOLVE

14 Case Studies