ETAP
104 Case Studies
A ETAP Case Study
Voltex Power Engineers, a specialist in high-voltage power systems, faced significant organizational challenges in managing the dynamic electrical networks for natural gas wells across Queensland, Australia. Their primary issues included maintaining a single, accurate model across hundreds of assets, fragmented workflows from multiple consulting firms, and loss of institutional knowledge due to staff turnover. To address this, they turned to ETAP's NetPM solution.
ETAP implemented its Network Project Manager (NetPM) to create a centralized, secure collaboration environment. This solution eliminated version conflicts, automated the synchronization of design changes, and streamlined engineering workflows. The results for Voltex included a single source of truth for their network model, a dramatic reduction in human errors, and future-proof data governance, transforming their process into a unified and efficient digital workflow.