
ETAP
54 Case Studies
A ETAP Case Study
Adding distributed generation sources to existing power distribution systems and the implementation of islanding microgrid capability introduce protection and control challenges if not properly designed. Each new generator may present a new source ground fault current to the system, which can result in unanticipated breaker operation. Energy Systems Group, was using ETAP to model the system and check coordination of local and remote breakers can reduce downtime and troubleshooting.