Schneider Electric - Customer Case Study

A ETAP Case Study

Case study about Schneider Electric working with ETAP.

Since the release of IEEE 1584-2018, the industry has been challenged to reach a consensus on applying the new standard. The most significant application “pain” so far has been identifying actual equipment data for input to the study, including bus gap and electrode configurations in the equipment. A case study of an arc flash analysis for a large university campus with MV and LV power distribution equipment of different types, vintages, and manufacturers is presented. The presentation highlights selection of electrode configuration(s) for various equipment types and voltage levels and correct application of arc current and enclosure size correction factors to significantly reduce the data entry time and effort. The presentation will cover upcoming IEEE P1584.1 revisions to apply IEEE 1584 for arc-flash hazard calculations directly from the revision subgroup chair.


ETAP

54 Case Studies