
ETAP
54 Case Studies
A ETAP Case Study
ETAP makes the creation of multiple configurations and operating modes for the system being modeled easy once the model has been created and then the available incident energy for each bus in each configuration can be determined and compared. The worst case incident energy and corresponding personal protective equipment (PPE) can be put on arc flash labels to be applied to the equipment.