Planning, Design, and Validation of a Microgrid using ETAP Digital Twin Platform

A ETAP Case Study

Case study about PTI working with ETAP.

PTI logo

PTI

The implementation of a Microgrid involve several stages, in which the engineer has to deal with the interaction of different processes and dynamics, taking into account the different modes, topologies and scenarios that the system could possibly have. This is the case of an ongoing project for an important Grid operator in Colombia, in which PTI S.A and OTI are working together to deliver a comprehensive Monitoring and Control system for an entire Microgrid, comprised of different energy resources as Diesel, Solar, Batteries and a connection to the Public Grid. Project stages involve Planning, Design, Validation, In site Deployment and Testings, and for that purposes, Etap PS/RT and Opal RT solutions will be used, on a Digital Twin Platform environment.