Case Study: L&T-Sargent & Lundy Limited ensures stable generator step-loading performance with ETAP

A ETAP Case Study

Preview of the a chemical fertilizer plant in India Case Study

L&T-Sargent & Lundy Limited verifies generator stability with ETAP and keeps frequency within 99.567%

The customer, Larsen & Toubro (L&T)-Sargent & Lundy Limited, faced the challenge of evaluating the transient stability of two 25-MW gas-turbine generators for a fertilizer plant during sequential step loading events. They needed to accurately model the generator dynamics and confirm that all transient voltage and frequency dips remained within strict operational limits using ETAP's software.

ETAP provided the solution through its Transient Stability module and dynamic models. Using OEM-verified IEEE-standard models, ETAP enabled engineers to simulate and visualize the system's response across eight load steps. The results confirmed stable operation with all parameters, including a minimum steady-state voltage of 94.69% and frequency of 99.567%, remaining within acceptable limits. This provided operational confidence and verified that no corrective actions or protection changes were required.


View this case study…

ETAP

105 Case Studies