Eradeh Power Consulting boosts fleet uptime 20% with ETAP

Eradeh Power Consulting, a provider of power engineering services, faced the challenge of addressing power quality issues and operational inefficiencies caused by unbalanced harmonic distortions at a large electric vehicle charging site with over 300 stations. To identify the root cause and develop mitigation strategies, they utilized ETAP's Digital Twin and its Unbalanced Harmonic Analysis (UBHA) service.

Using ETAP's digital twin model, Eradeh was able to perform simulations and validate field data to implement effective mitigation solutions. As a result, ETAP helped them increase energy savings by 10% and boost fleet uptime by 20% by reducing harmonic-induced losses and preventing equipment mis-operation.