ETAP
104 Case Studies
A ETAP Case Study
Dicyp Ingeniería BIM was tasked with designing the complex electrical infrastructure for a major hospital project in Chile, a challenge that included routing over 5,000 circuits and coordinating across multiple disciplines. To ensure accuracy and manage the project's scale, they chose the ETAP Caneco BIM solution for its reliable electrical calculations and BIM integration.
By implementing ETAP's Caneco BIM, which integrated with Autodesk Revit and BIM 360, Dicyp automated the routing of all circuits. This solution delivered a massive time savings of 4,000 engineering hours, improved collaboration for up to 200 simultaneous users, and reduced construction costs by resolving issues in the design phase.