Case Study: Telehouse achieves 10.4% lower cooling electricity use with etalytics etaONE®

A Etalytics Case Study

Preview of the Telehouse Case Study

Telehouse cuts cooling electricity use by 10.4% with Etalytics

The customer, Telehouse, faced the challenge of finding additional energy efficiency within the already optimized cooling infrastructure at its Frankfurt data center. The goal was to reduce electricity consumption without compromising operational reliability or control, while also adhering to site-specific restrictions. They partnered with the vendor Etalytics to implement its etaONE platform.

Etalytics used its etaONE platform, which employs AI, predictive analytics, and digital twins, to optimize the cooling system's setpoints in real-time. The solution achieved a measured 10.4% reduction in electricity consumption on the first cooling unit and is projected to save approximately 497 MWh of electricity per year across the full system, avoiding an estimated 180 tonnes of CO₂ emissions annually.


View this case study…

Etalytics

8 Case Studies