Esko
138 Case Studies
A Esko Case Study
VCG-Connect, a European provider of digital reprographics and photopolymer printing plates, sought to prevent idle time and optimize equipment utilization in its production process. To address this challenge, the long-standing Esko customer worked with the vendor to implement its Device Manager module for Automation Engine.
The Esko solution provided a real-time dashboard that integrated plateroom operations with the prepress workflow, granting complete visibility into machine workload and status. This allowed VCG-Connect to streamline operations, intelligently manage rush jobs, reduce cycle times, and significantly increase efficiency, leading to a smoother, more productive, and profitable workflow.
David Piercy
Device Manager & Operations Director