Case Study: Little Dixie Construction improves fleet efficiency and fuel savings with EquipmentShare T3

A EquipmentShare Case Study

Preview of the Little Dixie Construction Case Study

Little Dixie Construction - Customer Case Study

Little Dixie Construction, a general contractor with over 50 years of experience, needed a better way to manage its fleet of equipment and vehicles, focusing on improving service, operational efficiency, and reducing costs like excessive fuel consumption from idling.

EquipmentShare implemented its T3 technology, providing telematics for real-time tracking, diagnostics, and detailed equipment utilization reports. This solution from EquipmentShare enabled Little Dixie to drastically reduce its vehicle idle time from over 14% to 5%, cutting its fuel bill in half within a three-month span and making fleet management and accounting significantly more efficient.


View this case study…

Little Dixie Construction

Ed Erdel

Operations Manager

<iframe width="554" height="310" src="" title="A Customer Success Story: Little Dixie Construction + T3" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>


EquipmentShare

7 Case Studies