A EquipmentShare Case Study
Granite Construction Company faced a significant challenge while building a large concrete bridge for Chicago's 75th Street Corridor Improvement Project. Soaring summer temperatures threatened the concrete curing process, which can lead to structural weaknesses if not properly controlled. Granite needed a reliable method to circulate chilled water through a network of pipes embedded in the concrete to manage the heat.
EquipmentShare designed and provided a mobile concrete cooling plant, utilizing chillers mounted on trailers for this specific application. This turnkey solution allowed Granite to efficiently manage the concrete's temperature during successive pours. EquipmentShare's planning, on-site setup and remote monitoring ensured operational excellence and uninterrupted power, enabling the successful and streamlined construction of the vital infrastructure project.