eQ Technologic
35 Case Studies
A eQ Technologic Case Study
GE faced the challenge of modernizing its Product Lifecycle Management (PLM) system by upgrading from Teamcenter 8.3 to 11.2 and retiring legacy systems, all while ensuring data integrity and continuity. To accomplish this, the company engaged eQ Technologic and utilized their eQube®-DaaS platform for the large-scale migration and integration project.
eQ Technologic implemented a phased migration using their platform, which handled bulk and incremental data transfers and supported multi-domain data like eBOM and mBOM. The solution included advanced data validation and an integrated business intelligence tool for quality assurance. The results were highly successful, with GE achieving a 99.99% data migration accuracy rate, a 20% reduction in costs from retiring old systems, and a seamless upgrade to the latest Teamcenter version.