A Envista Forensics Case Study
A large institutional facility faced a major operational disruption when a critical dry-type transformer failed overnight, causing a power outage and extensive equipment damage. The facility retained Envista Forensics to conduct a forensic engineering investigation to determine the cause of the failure and assess the associated costs.
Envista Forensics investigated and concluded the transformer failure was caused by an external electrical surge from a utility disturbance. Their solution included a detailed assessment of the damage, validation of repair and replacement costs, and assistance in sourcing a compatible replacement transformer. This allowed the facility to restore operations with temporary power while planning permanent repairs. The investigation by Envista Forensics provided clarity on causation for the insurer and validated the necessary restoration costs.
Large Institutional Facility