EnergyCAP
52 Case Studies
A EnergyCAP Case Study
Clayton Hotels Cardiff Lane, part of the Clayton Hotels group, was battling chronically high energy consumption and unexplained usage spikes that added thousands of euros to monthly bills. The hotel’s maintenance team also found operational inefficiencies—air conditioning left on in non‑critical areas and fans manually overridden—that worsened costs. To address this, the hotel engaged EnergyCAP for an energy management solution combining sub‑metering, smart‑meter integration and a real‑time monitoring platform.
EnergyCAP implemented sub‑metering and smart meters across key circuits and fed the data into its energy management platform to enable real‑time monitoring, automated alerts for consumption spikes, benchmarking and wastage analysis. As a result, Clayton Hotels Cardiff Lane reduced consumption significantly (hundreds of thousands of kWh since 2014), cut thousands of euros in energy costs, received timely alerts that flagged a Q1 2019 spike tied to ~€31,000 supplier costs, and was on track to achieve €40,000+ in savings for the 2018–2019 year thanks to EnergyCAP’s insights and reporting.
Ioan Luntrariu
Facility Manager