Case Study: illwerke vkw AG achieves safer, always-on hydropower inspections with Korial and Energy Robotics

A Energy Robotics Case Study

Preview of the illwerke vkw AG Case Study

illwerke vkw AG automates inspections at 1,700-metre hydropower plant with Energy Robotics

illwerke vkw AG needed to replace manual, weather-dependent inspection rounds at a high-alpine hydropower plant where access was difficult and conditions were hazardous. To address this challenge, the customer worked with Energy Robotics, deploying its Korial platform alongside a Boston Dynamics Spot robot to automate these inspections and improve safety.

Energy Robotics implemented a solution where the Spot robot, equipped with various sensors, performed autonomous missions to read instrumentation and detect thermal and environmental anomalies. This provided illwerke vkw with machine-grade consistency in its data collection, decoupled routine inspection from human presence for greater safety, and established a repeatable model for autonomous inspection across its wider portfolio of power generation sites.


View this case study…