Case Study: Messer companies in Poland achieves 20 MW of flexible capacity with Enel X Polska

A Enel X Case Study

Preview of the Messer companies in Poland Case Study

Messer: Making Demand Response Work for Hard-to-Flex Sites

The customer, Messer companies in Poland, faced a significant challenge with their cryogenic air separation plants, which were considered extremely difficult for demand response due to their all-or-nothing operation. The plants could not partially reduce power, and shutting down was either too costly or pointless for short periods, making them ineligible for standard programs. The vendor, Enel X, through its Enel X Polska team, provided a tailored demand response service to address this inflexibility.

Enel X implemented a solution by negotiating a unique agreement structure built around the plants' specific operational capabilities. This removed exposure to calls that were too short, too long, or too frequent for the sites to serve. As a result, both plants were able to enroll all their available capacity, achieving a combined 20 MW of declared reduction and earning revenue from flexibility markets despite the system operator's subsequent changes to call windows and volume limits.


View this case study…

Enel X

81 Case Studies