Case Study: Large Chemicals Manufacturer achieves 98% faster LOTO preparation with Enablon

A Enablon Case Study

Preview of the Large Chemicals Manufacturer Case Study

How a Large Chemicals Manufacturer Reduced LOTO Preparation by 98%

A Large Chemicals Manufacturer was struggling with an inefficient old permit system that made lockout tagout (LOTO) preparation time-consuming, pulled operators away from the plant, and created incomplete permits and missing documentation. The company needed a better way to manage permits, isolations, and compliance, and turned to Enablon Control of Work.

Enablon implemented its Control of Work solution to digitize and standardize permit preparation, pre-plan isolations, and improve shift handovers with clear permit visibility. As a result, the company reduced LOTO preparation by 98%, lowered risk in the plant, and strengthened compliance with standardized procedures.


View this case study…