Case Study: a leading network equipment company achieves 80Gb load performance with Emblasoft PureLoad

A Emblasoft Case Study

Preview of the Leading Network Equipment Company Case Study

How to solve the challenge of high-throughput full-stack mobile traffic testing for Tier 1 operators

A leading network equipment company needed to prove to a tier 1 operator that its new solution could handle a massive 80 Gbit/s load, but its existing test tool could not generate the required performance or model the specific, complex traffic flows. With only three weeks to meet its obligation, the vendor turned to Emblasoft and its PureLoad solution to solve this critical challenge.

Emblasoft designed and implemented a PureLoad platform that successfully simulated realistic web traffic from 10 million unique IP addresses, achieving the target of 80 Gbit/s throughput. This extreme performance test, completed ahead of schedule, provided the proof the vendor needed to assure the operator of the solution's performance, ensuring its acceptance and a successful delivery for a key customer account.


Open case study document...

Emblasoft

14 Case Studies