Case Study: WestRock APS achieves a 20% faster engineering cycle with Elmo Solutions' Agni Link

A Elmo Solutions Case Study

Preview of the WestRock APS (Automatic Packaging Systems) Group Case Study

WestRock APS boosts engineering cycle 20% with Elmo Solutions

The Automatic Packaging Systems group (APS) of WestRock faced a challenge in integrating their IFS ERP system with their Autodesk CAD/PDM applications. The manual data transfer between these systems was time-consuming and prone to errors, which hampered productivity and collaboration between their design and production departments. To address this, they turned to Elmo Solutions and its Agni Link connector.

Elmo Solutions implemented its Agni Link solution to create a seamless, bidirectional data flow between WestRock's IFS ERP and Autodesk applications. This automation eliminated manual data entry, reduced errors, and provided powerful tools like BOM comparison. As a result, WestRock APS achieved a 20% improvement in its engineering cycle, reduced rework, and freed up its design team to focus on new projects.


View this case study…

Elmo Solutions

3 Case Studies