Elecosoft
56 Case Studies
A Elecosoft Case Study
Produktiva, the construction arm of GRUPO EDIFICA in Lima, Peru, is a leader in Lean Construction but faced a challenge integrating its pull-planning methodology with traditional Critical Path Method (CPM) scheduling. Their existing tools, MS Project and Excel, were static and inefficient for their dynamic, location-based needs. They turned to Elecosoft and its Asta Powerproject software to find a solution that could bridge this gap.
By implementing Elecosoft's Asta Powerproject, Produktiva seamlessly combined lean pull-planning with CPM scheduling. The solution enabled dynamic, location-based plans, instant Line of Balance reporting, and remote progress updates via the Asta SiteProgress app. This streamlined their workflow, provided critical visual management for project managers, and allowed for quick reporting directly from the field. Elecosoft's tool provided the integrated, sophisticated yet easy-to-use platform that supported Produktiva's lean philosophy and laid the foundation for future BIM and 4D implementation.
Julio Obando
Cultural Centre´s Project Manager