Case Study: Large Coal Company improves efficiency and throughput with Eka Control Systems

A Eka Case Study

Preview of the Large Coal Company Case Study

Large Coal Company Increases Efficiency With Eka Control Systems and Plan Performance Application

Large Coal Company, one of Australia’s largest coal port operators, needed a better way to plan and manage material movement while maintaining operator safety. Because machines were positioned far apart, the company faced lower planning efficiency, unpredictable throughput, inefficient cargo delivery, frequent relocation disruptions, and operator errors that hurt profitability. Eka provided its Control Systems solution suite along with the Plan Performance App to address these challenges.

Eka implemented a digital twin of the material lifecycle to model, track, control, and analyze end-to-end mining operations, including stacking, reclaiming, conveyor interlocking, yard rate, blend rate control, and logistics. The solution improved bulk stock management, shortened loading times through automated task changes and backups, reduced operator error, increased predictability of production plans, and improved reclaimer efficiency with higher reclaim rates and less wear and tear. It also improved stacking accuracy, maximized stockyard space, and gave the business real-time inventory and status visibility.


Open case study document...