A Egnyte Case Study
Alberici Corporation, a $2B diversified construction firm with 17 regional offices and roughly 100 concurrent projects, was struggling with content sprawl and slow file synchronization across branch and project sites. Their Nasuni proof-of-concept couldn’t scale—sync times grew from minutes to hours—and SharePoint’s architectural limits and complex permissions would have forced disruptive reorganizations, leaving field teams (notably VDC/BIM) unable to reliably access large models.
Alberici deployed Egnyte to centralize content with granular permissions, local offline sync, smart caching, and Procore integration. The solution eliminated multi-hour sync delays, enabled VDC/BIM teams to work with huge files offline, standardized project folder structures for easier collaboration with subcontractors and clients, lowered remote storage and bandwidth costs, and improved auditing and remote-work support.
Ron Borror
Director, IT Infrastructure