The customer, Conrad Energy, required a solution to help balance the UK electricity grid and support the integration of renewable technologies. They engaged the vendor, Edina, to supply a flexible generation power plant to meet this challenge.
Edina designed, supplied, and commissioned a 20MWe plant for Conrad Energy, utilizing 10 containerized MWM gas engines. The project was completed on time and within budget. This solution provides fast-responding, dispatchable power, ensuring grid stability during periods of high demand or low renewable output. The plant produces enough electricity to power nearly 11,000 local homes when needed.
Steve Conry
Construction and Operations Director