The infrastructure developer ForePower required a battery energy storage system to help balance the UK electricity network and support the nation's energy transition. They engaged the solutions provider Edina to deliver a 10MW BESS on a site with challenges including disused industrial land.
Edina provided a full turnkey EPC solution, designing and installing a modular system with CATL lithium-ion batteries and SMA inverters. This compact design reduced the site footprint by 40% and improved installation efficiency by the same amount. The completed system allows ForePower to participate in capacity and wholesale markets, providing power security and accelerating renewable energy integration for the UK grid.
Steve Thorpe
Chief Operating Officer (COO) and Project Director