Edina
44 Case Studies
A Edina Case Study
The customer, Conrad Energy, required a solution to support UK grid stability and integrate renewable energy sources. They faced challenges related to site access and proximity to rail infrastructure. Vendor Edina was selected to deliver a flexible generation energy centre using MWM gas reciprocating engines.
Edina implemented a 10.3MWe power plant comprising six hydrogen-enabled MWM engines. The solution involved a two-phased approach, including detailed design and the construction of a bespoke building to overcome site constraints. The resulting Witham Energy Centre provides fast-responding dispatchable power to the National Grid, helping to prevent blackouts and balance supply and demand. This project adds to Conrad Energy's portfolio of over 80 flexible generation sites.