EcoSys Management
9 Case Studies
A EcoSys Management Case Study
Ball Aerospace and Technologies Corp., a leading aerospace manufacturer, needed a better way to manage program costs, budgeting, forecasting, and estimating across the enterprise. Its internal Excel- and VBA-based tools were difficult to maintain, required extensive manual rate validation, and made it hard to standardize data or analyze projects as a single consolidated rollup.
EcoSys Management implemented EcoSys EPC, replacing Ball Aerospace’s disconnected tools with a single source of truth integrated with existing ERP and scheduling systems. The solution enabled full-lifecycle integrated program management, faster reporting, deeper analysis, and improved variance tracking; as a result, Ball Aerospace gained new business metrics, greater visibility into business drivers, and significant time savings through more efficient, real-time decision-making.
Mike Coan
Director of Project Controls