EcolightingUK was chosen by The Bristol Port Company to address a lighting challenge at their facility. The port needed to significantly increase light levels while also reducing energy consumption, replacing their old 400w sodium fittings.
EcolightingUK installed their Ecolite Industrial Hi-Saver and Rackmaster luminaires with PIR sensors. This solution successfully doubled the light levels and achieved energy savings of 53%, which equated to over £9,500 in annual cost savings and a reduction of more than 63,000 kg of CO2. The Bristol Port Company was delighted with the results and plans to upgrade more buildings.