EcolightingUK
51 Case Studies
A EcolightingUK Case Study
The customer, Great Bear, a leading UK logistics business, needed to improve the working environment and efficiency of its 24/6 Skelmersdale Distribution Centre. The existing lighting scheme, composed of old 400w metal halide high bay fittings, was outdated. EcolightingUK was contacted to evaluate the site and recommend a suitable lighting solution.
EcolightingUK implemented a new scheme using a combination of their Ecolite Industrial Hi-Saver and Rackmaster LED fittings. This upgrade saved the customer more than 80% in energy consumption and cost, providing a return on investment in less than 1.3 years. The new lighting also drastically improved light levels and uniformity, with the extended lamp life greatly reducing future maintenance impact on operations.