Case Study: Sunstone Circuits achieves uninterrupted uptime and reliable connectivity with Ecessa PowerLink

A Ecessa Case Study

Preview of the Sunstone Circuits Case Study

When your ability to compete is measured in minutes, you can’t waste a second with unreliable Internet connections

Sunstone Circuits, a Mulino, OR PCB fabricator known for fast, small-run prototypes and a 30-minute average response time, faced a critical telecommunications challenge: any network outage threatened its ability to accept online orders and process rapid change requests. To protect its web and database services and ensure continuous customer responsiveness, Sunstone deployed Ecessa’s PowerLink® for failover protection.

Ecessa implemented a redundant network architecture—two fiber lines plus a broadband backup—and upgraded to two PowerLink units in a mirrored hardware failover configuration, also leveraging PowerLink’s firewall and VPN features. The automatic failover kept operations running during an accidental fiber cut, prevented service interruptions, eliminated overnight outage calls, and allowed Sunstone Circuits to handle heavy traffic and maintain fast online service delivery with no noticeable throttling.


Open case study document...

Sunstone Circuits

Mike Butler

Network Administrator


Ecessa

25 Case Studies