Ecessa
25 Case Studies
A Ecessa Case Study
Trans States Airlines, a St. Louis–based carrier operating roughly 237 routes daily for United Express and American Eagle, needed 24/7 reliable voice and data connectivity to support flight operations, crew communications and FAA requirements. After deploying a backup carrier and dual MPLS links, their planned BGP failover didn’t work, leaving the airline exposed to outages that could ground flights. Ecessa was engaged to address this critical reliability challenge, using its WANworX solution.
Clarus Communications and Kb Data recommended and deployed Ecessa’s WANworX SD‑WAN across Trans States’ primary sites, delivering fully automatic failover, VPN tunnels that reduced VDI jitter/lag/drop, pinpoint routing and analytics. Ecessa’s solution separated heavy application traffic (e.g., weather data), freed bandwidth, avoided costly leased‑line purchases, lowered cost per Mbps by converting static failover circuits to active use, and enabled ongoing rollout to further reduce costs and improve resilience.
Jeff Holmstedt
VP and CIO