Case Study: a major state transportation authority achieves compliant contaminated soil removal with EBI Consulting

A EBI Consulting Case Study

Major State Transportation Authority manages 2,831 tons of contaminated material with EBI Consulting

A major state transportation authority faced significant environmental challenges during a $24 million bridge rehabilitation project. The discovery of contaminated soil, asbestos-containing materials, and hazardous waste threatened to delay construction and posed safety risks. They partnered with environmental consultant EBI Consulting to manage the remediation and ensure regulatory compliance.

EBI Consulting implemented a comprehensive environmental management strategy that included site investigation, hazardous waste characterization, and continuous air monitoring. Their solution ensured the safe removal and disposal of 2,831 tons of contaminated material, maintained 100% regulatory compliance, and helped keep the critical infrastructure project on schedule.


View this case study…

EBI Consulting

16 Case Studies